Manufacturing-IT

AOS

Automatic Order Scheduling - Production Planning and Control Systems

Based on the start and finish dates that are specified by ERP (outline planning), the automatic order scheduling system creates detailed order scheduling (detailed planning) taking into account all the relevant influencing parameters, like:

-    Delivery dates
-    Order priorities
-    Availability of personnel
-    Availability of resources
-    Availability of material
-    Cleaning and setup times

It is possible to weight the parameters to a greater or lesser extent by configuration to achieve an optimum planning result for the respective application. The system supports both hard and soft constraints. The system displays the planning result to operators clearly as a Gantt diagram, which they can modify manually.

Return to the start of the page (press enter)Go to the end of the page (press enter)